VeilHouse
/
Document
D-377

Incident Report — Unauthorized Excavation, Shaw Area

Incident report on unauthorized night excavation. Report filed, marked 'No violation observed' despite resident complaint.

File Information

Document ID
D-377
Date
2017-08-14
Originating Entity
DC Department of Public Works — Enforcement Division
Receiving Entity
Internal — Compliance File
Distribution
Enforcement Division, Complainant (copy mailed)
Classification Status
Public Record — Complaint Response

Document Body

INCIDENT REPORT — COMPLAINT RESPONSE

Report No.: DPW-ENF-2017-04822
Date of complaint: August 12, 2017
Date of site visit: August 14, 2017
Complainant: [NAME WITHHELD], resident, [ADDRESS WITHHELD]

Nature of complaint: Complainant reports unauthorized excavation activity at a construction site adjacent to their residence in the Shaw planning area. Complainant states that heavy equipment was operating after 22:00 on the evenings of August 10, 11, and 12. Complainant states the noise and vibration are affecting the structural integrity of their home.

Site visit findings: An enforcement officer visited the site on August 14, 2017, at approximately 09:30 AM. The site is enclosed by chain-link fencing with privacy screening. Two excavators were present on the site. Portable floodlight equipment was present, consistent with night work capability. No workers were observed on site at the time of the visit.

The enforcement officer noted that the site’s construction permit authorizes work between 07:00 and 19:00, Monday through Saturday. No after-hours variance was on file with the Department.

Determination: No violation observed.

The enforcement officer’s field notes indicate that the equipment was “consistent with daytime operations” and that “no evidence of active night work” was present at the time of the visit. The portable floodlight equipment was not addressed in the determination.

Complainant notified by mail on August 16, 2017.