VeilHouse
/

T-633: Transcript: Compliance Interview — DC Department of Buildings

Restricted Material Transcript T-633 Transcript: Compliance Interview — DC Department of Buildings Compliance interview. Inspector says he was told to close the contractor discrepancy file. Won't say who told him. File Information Transcript ID T-633 Date 2017-02-14 Time 11:07 Location DC Department of Buildings — Internal Affairs conference room Recording Source Digital voice recorder — … Read more

D-341: Demolition Permit Review — Contractor Discrepancy

Document D-341 Demolition Permit Review — Contractor Discrepancy Demolition permit review noting contractor on permit does not match contractor observed at site File Information Document ID D-341 Date 2016-11-03 Originating Entity DC Department of Buildings — Permit Review Division Receiving Entity Internal — Compliance File Distribution Permit Review Division, Legal Affairs Classification Status Internal Review … Read more

OB-999: Observation Log: Cleared Lot, Night Construction Activity

Observation Log OB-999 Observation Log: Cleared Lot, Night Construction Activity DC Department of Buildings night capture of cleared lot with excavators and floodlights, Shaw area, SC7 camera 2017-05-19 · 22:03 / CAM-DOB-SC7-02 OB-999 Observation ID OB-999 Date 2017-05-19 Time 22:03 / CAM-DOB-SC7-02 Location Cleared lot, Shaw neighborhood Source Fixed exterior camera — elevated, south-facing Monitoring … Read more

OB-349: Observation Log: Demolition Site, Shaw Neighborhood

Restricted Material Observation Log OB-349 Observation Log: Demolition Site, Shaw Neighborhood DC Department of Buildings camera capture of Shaw neighborhood demolition site with excavator and rubble 2016-07-28 · 09:22 / CAM-DOB-SC7-01 OB-349 Observation ID OB-349 Date 2016-07-28 Time 09:22 / CAM-DOB-SC7-01 Location Corner lot, Shaw neighborhood Source Fixed exterior camera — elevated, northeast-facing Monitoring Entity … Read more

OB-906: Observation Log: Large-Scale Construction Site, Night

Observation Log OB-906 Observation Log: Large-Scale Construction Site, Night DC Department of Buildings night capture of massive construction site with excavators, residential buildings surrounding 2019-09-30 · 21:44 / CAM-DOB-P3N-01 OB-906 Observation ID OB-906 Date 2019-09-30 Time 21:44 / CAM-DOB-P3N-01 Location Construction site, P Street NW corridor Source Fixed exterior camera — elevated, north-facing Monitoring Entity … Read more